Strectch 2N. Line 9. Barcelona Metro

LOCATION: Barcelona, Spain |
FEES: 3,216,510 € |
CLIENT: Gestió d’Infraestructures, S.A. (GISA) |
AMOUNT OF WORKS: 566,622,064 € |
SECTOR: Metro |
Environmental Study & Detail Design: Line 9 FMB. Stretch: 2N. Parque Logístico-Zona Universitaria
New Metro in Barcelona. 12,36 km of double track. Total Length of tracks 29,02 km (including 4,3 km of railways in workshops)
o 5.869 m of Tunnel with TBM of 12,06 m double track.
o 1.466 m of Tunnel with TBM of 9,40 m double track
o 1.856 m of tunnel in cut & cover
o 469 m of tunnel in mine
o 2.700 m of couble track in viaduct.
o 8 stations in wells 26m diameter:
o 3 elevated stations 129 m each
o Design of new workshops biuiding 650 m length and 30 m width , 4,3 km of railways and depots for 20 trains
TAGS: Tunnel, Elevated Metro, Viaduct, Detail Design, Environmental Study