Line 9
Stretch I
Barcelona Metro

Location:
Barcelona, Spain

Client:
Infraestructures
de la
Generalitat de
Catalunya

Sector:
Metro

Fees:
5,635,693.45 €

Amount of Works:
703,467,817.06 €

Detail Design and Supervision of works of 13 Stations and 11 ventilation Wells, one of them emergency exit as well , in 15,62 km (Stretch 1 of New All the statiuon are underground up to 18 m, built in Cut & Cover of 120 x 20-35m. Some wells are circular of 17 m diameter and some square 14m x 9m. The Installations designed are: Fire Control, Plumbing, , Drainage and sewerage, AC, Ventilation,, Medium and Low Voltage, Illumination, Installations Control, Access Control, Architecture and Interfaces.

TAGS: Civil Works, Architecture, Instalations, Interfaces, Stations, Wells, Ventilation

PREV    |    NEXT